Cladding remediation to an occupied building
Volsen is Principal Contractor for the external wall remediation of Observatory Court, a five-storey mixed-use residential building in Friern Barnet in London.
Intrusive investigation identified several external wall build-ups, two of which contained combustible material. Opening-up works were carried out alongside the architect under a PCSA contract before the main works were let, establishing the extent of remediation required on each elevation. The combustible build-ups are stripped back to the retained structural framing and rebuilt as a non-combustible external wall, to a design by Noviun Architects, with surveying practice FRC Consultants acting for the client, Xenon Properties.
The replacement façade is non-combustible through the cladding, support system, insulation and sheathing board: Hardie VL Plank weatherboard and Vitradual Rivet Fix cladding over a ventilated cavity on an Nvelope cladding support system, with Rockwool Nyrock Rainscreen Slab insulation and 12mm RCM Y Wall calcium silicate board. The retained framing is infilled with 80mm Rockwool Nyrock Frame Slab and 20mm mineral wool, behind an OBEX CORTEX FR032 breather membrane and OBEX CORTEX 0230FR vapour control layer. Alongside removing the fire risk, the new build-ups lift thermal performance to U-values of 0.27 and 0.18 W/m²K on the two remediated wall types.
[Volsen’s] proactive forward thinking goes above and beyond what is expected. [Volsen] has demonstrated unwavering reliability and support throughout the project programme, offering reassurance and maintaining availability to all project stakeholders.
The building sits above an occupied retail unit, alongside a working railway, on a busy pavement, with vehicle access through a 3.3m underpass. Work beside the railway line is carried out under a Basic Asset Protection Agreement, the shop trades throughout, and the underpass dictates delivery sizes, scheduling and the lifting strategy.
People live in the building throughout the works. A resident meeting was held before they began, and residents have a direct route to the team with any question or concern. The programme is phased so scaffold stands for the shortest practical time on each elevation rather than enclosing the whole building at once, limiting loss of light and disruption.
Scaffolding forms part of the Volsen package. The scaffold to the treated elevations was erected by NASC-registered scaffolders, with Category 3 independent design checks where required.
Hold points are inspected by Building Control before anything is covered up, and a visiting Clerk of Works checks quality independently of the site team. Compliance work is carried out with the London Fire Brigade, and the London Borough of Barnet’s enforcement officer receives regular programme updates.