Protecting buildings. Restoring compliance.
As building safety legislation continues to evolve, the need for specialist fire remediation expertise has never been greater.
Volsen delivers comprehensive fire remediation solutions for residential, commercial and mixed-use developments across the UK. Working collaboratively with clients, consultants, manufacturers and principal designers, we provide safe, compliant and fully managed remediation projects that restore confidence in buildings while meeting the latest regulatory requirements. Whether replacing unsafe cladding systems, remediating external wall systems or upgrading fire safety components within the building envelope, our focus remains the same: delivering technically sound, high-quality solutions that stand the test of time.
Building safety starts with the right partner.
The Building Safety Act has fundamentally changed how high-risk buildings are designed, managed and remediated. Successfully delivering remediation projects requires more than construction expertise; it demands collaboration, technical understanding and rigorous compliance throughout every stage of the project.
At Volsen, we bring together practical construction knowledge, experienced project management and trusted manufacturer relationships to deliver remediation projects safely, efficiently and with minimal disruption.
Our commitment is simple: Safety. Quality. Compliance.
Safe removal and replacement of non-compliant cladding systems using tested, approved materials that meet current Building Regulations.
Repairing and upgrading building façades to improve fire performance while protecting the integrity and appearance of the external envelope.
Comprehensive replacement of external wall systems where existing construction no longer satisfies current fire safety requirements.
Integration of compliant roofing systems, waterproofing interfaces and fire stopping measures as part of wider remediation programmes.
Supporting clients through intrusive investigations, condition surveys, opening-up works and technical reporting to identify remediation requirements.
Delivering expertly managed remediation works in accordance with current legislation, manufacturer specifications and recognised industry standards.
Our experience across roofing, façades, waterproofing and external envelope systems enables us to provide integrated remediation solutions.
Working closely with clients, consultants and manufacturers from start to finish.
Delivering compliant solutions using trusted products and experienced teams.
Safety and compliance are at the heart of every project.
Review and evaluate the building.
Identify remediation requirements.
Develop compliant solutions.
Complete remediation works safely and efficiently.
Provide quality assurance and compliance documentation.
Fixing fire safety defects in a building’s external walls, most often by replacing unsafe cladding, insulation and cavity barriers, so the building meets current fire safety standards.
A Fire Risk Appraisal of External Walls assesses the risk of fire spreading across a building’s outside walls. It is carried out by a competent fire engineer under PAS 9980, which was revised in September 2026, and it decides whether remediation is needed.
No. An EWS1 is a form used by lenders and valuers for mortgages, while an FRAEW is the fire risk appraisal that decides what remediation work is needed.
Any residential building where an FRAEW finds an unacceptable fire risk in the external walls. The government’s target is for every building over 11 metres with unsafe cladding to be remediated, or to have a completion date set, by the end of 2029.
Developers are responsible first. Otherwise the building owner pays, with government funding available for eligible buildings. Under the Building Safety Act 2022, qualifying leaseholders in buildings over 11 metres or five storeys cannot be charged for cladding remediation.
On high-risk buildings (at least 18 metres or seven storeys, with two or more homes), work to the external walls needs building control approval from the Building Safety Regulator before it begins.
In most cases, yes. Every Volsen project has a dedicated community liaison who runs resident meetings and a phone line for questions and concerns.
Yes. We support clients with intrusive investigations, condition surveys, opening-up works and technical reporting to identify what remediation is required.
Yes. We can take a remediation project from design through to completion, working with your consultants, fire engineers and manufacturers.
Yes. As well as cladding, we can replace complete façades, including windows, doors and balconies.
Yes. Installed systems are tested and certified, and we provide the quality assurance and compliance documentation at handover.
Yes. We regularly act as principal contractor under CDM 2015, managing health and safety and coordinating every trade on site.

Whether you’re planning remediation works or require specialist advice, our team is here to help.