Roofing, SFS and aluminium
Volsen delivered the roofing, SFS and aluminium package on Wilderton House, a high-end, five-storey new build residential block of flats in Poole, for Harrison Group and Glossbrook Builders.
Delivered as one package, Volsen’s works covered an SFS system, aluminium capping, soffit and fascia and cladding, the roofing system and a solar mounting system.
Volsen delivered approximately 2,000m² of flat roofing across 27 individual roof areas, incorporating Bauder Thermofol, tapered insulation and an adhered vapour control layer. The complete build-up was designed to achieve BROOF(t4) classification and meet current regulatory requirements.
Inspections were carried out by Bauder, Roof Forensics and QANW. The roofing carries a 20-year manufacturer guarantee and a 10-year IBG.
Volsen installed a range of permanent fall protection systems across three roof levels, providing safe access for ongoing maintenance activities.
Horizontal safety lines were installed to the main roof for future maintenance of the PV panels and guttering, with a further horizontal safety line installed at fourth-floor level for gutter maintenance. At third-floor level, a dedicated safety eyebolt was installed to provide an anchor point for servicing and maintaining the air conditioning equipment.
All safety systems were installed, tested and certified for 12 months, with the installations incorporated within the Bauder Guarantee.
Volsen used its experience and technical knowledge to create bespoke detailing at the interfaces between different products, while conforming to the specification.
The main roof required two different roofing build-ups to accommodate fire regulations, incorporating a fire-rated board along the central party wall and timber decking elsewhere. This required careful coordination of vapour control layers, fixing methods and interfaces to create a seamless hybrid solution that satisfied fire requirements and maintained the Bauder warranty.
Volsen installed the SFS framing and insulation to support the aluminium cladding, alongside additional framing for the render board. Close coordination with the render contractor was essential to ensure accurate alignment where the aluminium cladding met the rendered façade, achieving a consistent, flush finish across both materials.
Volsen installed thresholds and trays throughout the building, incorporating them into a fully bonded waterproofing arrangement. This ensured continuity with the main waterproofing system, creating a uniform, watertight solution across critical interfaces while maintaining consistent detailing throughout the building.