One point of responsibility on site
As principal contractor, Volsen can be appointed to plan, manage, monitor and coordinate health, safety and overall work during the construction phase of a project involving more than one contractor.
We create the construction phase plan before work begins and keep it updated throughout the project.
We control site risks and ensure the safety of workers and the public.
We manage the interaction between the different subcontractors and trades on site.
We provide and maintain clean toilets, washing facilities and drinking water from day one.
We liaise continuously with the client and the principal designer.
We prevent unauthorised access and keep the work area safe.
As principal contractor, we can carry out design consultation and fulfil all of our duties under CDM.
We coordinate with all parties before construction begins.
We produce construction phase plans and all associated documents.
We work with local authorities and other duty holders to see projects through their journey.
We have experience in executing PCSAs and have worked with consultants to take complex projects from concept to execution.
We keep every duty holder informed through regular project meetings and shared project documentation, and bring in specialist consultants, such as fire and structural engineers, wherever a project calls for them.
In the UK, the role is a formal legal requirement under the Construction (Design and Management) Regulations 2015 (CDM 2015) whenever a project has more than one contractor.
The regulations are enforced by the Health and Safety Executive (HSE), and the principal contractor must be appointed in writing by the client.
We act as principal contractor on remediation work to higher-risk residential buildings, working within the Building Safety Regulator’s gateway process and coordinating closely with the principal designer, building control and the wider project team.
A principal contractor plans, manages, monitors and coordinates health and safety during the construction phase of a project. That includes preparing the construction phase plan, controlling site risks, coordinating the different trades on site, providing welfare facilities and keeping the site secure.
Under CDM 2015, a principal contractor must be appointed in writing by the client whenever a project involves more than one contractor. The appointment should be made as early as possible, and before construction begins.
If the client fails to appoint a principal contractor, the client must carry out the principal contractor’s duties themselves. Appointing an experienced principal contractor ensures those legal duties are properly fulfilled.
Both roles are required on projects with more than one contractor. The principal designer plans, manages and coordinates health and safety during the pre-construction phase, while the principal contractor takes responsibility for the construction phase. The two work closely together throughout the project.
Yes, if more than one contractor will be involved. When working for a domestic client, the principal contractor will normally take on the client duties as well as their own, so homeowners do not have to manage CDM compliance themselves.
A construction phase plan sets out how health and safety will be managed during the construction phase, covering site rules, key risks and the arrangements for each stage of the work. Where a project has more than one contractor, the principal contractor prepares it before work begins and keeps it up to date as the project progresses.
Yes. We can provide design consultation, coordinate with all parties before construction begins, and work under Pre-Construction Services Agreements (PCSAs) to take projects from concept to completion.